Project  Profile
 
 

Name  of  the  Project    
 
Rehabilitation of 1998 Flood Damaged Urban Infrastructure  
 
Location  of  the  Project 
  • 10 Pourashavas under Secondary Towns Infrastructure Development Project-I(STIDP-I) 
  • 17 Pourashavas under Secondary Towns Infrastructure  Development Project-II(STIDP-II) 
  • 14 Pourashavas under Proposed Third Urban Development  Project(TUDP)
  • 62 Non-Project Pourashavas

 

Impact  of  the  floods  The 1998 floods will have major effects on Bangladesh's development, including: 
  • a setback in the reduction of poverty and a significant loss of income and assets among the poor
  • a fall in GDP growth from the projected rate of 6 percent to about 3.3 percent in FY 1999,due to a decline in all sectors,but particularly in agriculture
  • increased pressure on the balance of payments and the fiscal position,due to increased import requirements of food grains as well as the cost of rehabilitation works.This could lead to a reduction in ADP outlays
  • Significant damage to an already strained infrastructure slowing economic and social recovery

 
 

Objectives  of the Project  The Project objectives are :  
  • To rehabilitate 1998 flood damaged important urban infrastructure of the selected Pourashavas 
  • Restoration of normal levels of economy and social activity
  • To create direct and indirect employment opportunities through rehabilitation of the infrastructure of the project area

 

Proposed  date  of   
 i) Commencement   
ii)Completion 
  
October 1998   
June 2000
Financing  Plan   
  
 
 

ADB:US$ 9.264 Million = 4493.041 Lakh Taka    
GOB:US$ 2.241 Million = 1087.130 Lakh Taka   

Total: US$ 11.505 Million= 5580.171 Lakh Taka   

  
 

Physical  and  other  components of  the  project Roads,Drainage,Bridge and Culverts,Slum and Urban poor,Solid Waste Management

 
 